Stamford Route 1 and I-95 closures Aug. 16-18
From CT DOT. Starting Friday, Aug. 16 at 6 p.m. through Sunday, Aug. 18 at 6 p.m., the Route 1 (East Main Street) Bridge over I-95 in Stamford will be closed between Courtland Avenue and Seaside Avenue for the contractor to pour the bridge approach slabs. Traffic will be detoured from Route 1 to Courtland…
From CT DOT.
Starting Friday, Aug. 16 at 6 p.m. through Sunday, Aug. 18 at 6 p.m., the Route 1 (East Main Street) Bridge over I-95 in Stamford will be closed between Courtland Avenue and Seaside Avenue for the contractor to pour the bridge approach slabs. Traffic will be detoured from Route 1 to Courtland Avenue and Hamilton Avenue.
While the closure is in effect, the Exit 9 Southbound off-ramp and the Route 1 Northbound I-95 on-ramp will be closed. The following ramps will remain open:
- Exit 9 Northbound on- and off-ramps at Seaside Ave
- Exit 9 Southbound on-ramp
Travel lands on I-95 will be open and unaffected by the construction.
See the below map for the detour route.